Sikafloor®-1620

Sikafloor®-1620 is a state of the art, multi-component, high solids, low viscosity, moisture tolerant, epoxy primer that forms a dense, low permeability film on concrete substrates to significantly reduce moisture vapour transmission in compliance with ASTM F3010.

Sikafloor®-1620 product image
Sikafloor®-1620
THE MANUFACTURERSika

Protective coatings.
Local knowledge.

ChemistryEpoxy
Mixing ratioA:B = 3:1 (by volume)
THE RIGHT START MATTERS

KNOW THE
SURFACE.
PLAN THE
COATING.

Sikafloor®-1620 is a state of the art, multi-component, high solids, low viscosity, moisture tolerant, epoxy primer that forms a dense, low permeability film on concrete substrates to significantly reduce moisture vapour transmission in compliance with ASTM F3010.

Start with the surface, the existing finish and the way the space or equipment is used. Our team can help you work through product choices and the requirements for your project.

Get into the details
A workshop with a coated concrete floor
Project inspirationIllustrative project scene; not a documented installation of this product.
01 / CHECK

The surface.

Identify the material, its condition and the work you’re planning.

02 / PLAN

The system.

Confirm product suitability, preparation and compatibility with our team.

03 / CONFIRM

The conditions.

Check the current manufacturer instructions for application, installation or maintenance requirements.

PRODUCT SPECIFICATIONS

THE DETAILS.
ALL HERE.

Keep the technical information close.
Use the current manufacturer documents when planning the work.

Open the document centre
Sikafloor®-1620 product specifications
PackagingComponents A+B: 15.12 L (4 US gal) Component A: 11.34 L (3 US gal) Component B: 3.78 L  (1 US gal)
APPROVALS / CERTIFICATESMeets the requirements of CFIA for use in food plants
Shelf Life2 years in original unopened container under proper storage conditions
Storage ConditionsStore in a dry place, protected from freezing at a temperature between 5 °C and 32 °C (41 °F and 90 °F).  Protect from freezing. If Sikafloor®-1620 has frozen, contact Sika Canada.
Viscosity~370 cps (ASTM D2196)
Solid content by volume~99%
Shore D Hardness~83 (ASTM D2240)
Compressive Strength~99 MPa (~14,385 psi) (ASTM D695)
Tensile Strength in Flexure~83.8 MPa (~12,154 psi) (ASTM D790)
Tensile Strength~34 MPa (~4,931 psi) (ASTM D638)
Pull-Off Strength~3 MPa (~435 psi) (100% concrete failure) (ASTM D7234)
Permeability to Water Vapour~0.06 perm (at 15 mil d.f.t) (ASTM E 96)
Water Absorption~0.0029% (24 hrs) ~0.007%  (7 days) (ASTM D570)
Mixing RatioA:B = 3:1 (by volume)
Product TemperatureCondition product at temperatures between 18 °C and 30 °C (65 °F and 86 °F) before and during application.
Ambient Air TemperatureMinimum: 10 °C (50 °F) / Maximum: 30 °C (86 °F) Note: Mixing carried out under conditions where the Sikafloor®-1620 temperature and ambient temperature are below 18 °C (65 °F) will result in reduced product workability and slower curing rates.
Relative Air HumidityMaximum 85 % (during application and curing)
Dew PointSubstrate must be at least 3 ˚C (5 ˚F) above the Dew Point to reduce the risk of condensation, which may lead to adhesion failure or “blushing” on the floor finish.  Be aware that the substrate temperature may be lower than the ambient temperature.
Substrate TemperatureMinimum: 10 °C (50 °F) / Maximum: 30 °C (86 °F) Note: Any attempt to apply Sikafloor®-1620 at substrate temperature conditions less than 18 °C (65 °F) will result in an increase in viscosity and slower cure rates
Substrate Moisture ContentMoisture content of concrete substrate must not exceed 6 % by mass (p.b.w. – part by weight) as measured with a Tramex® CM/E concrete moisture meter on a mechanically-prepared surface (mechanical preparation to ICRI / CSP 3-4).
Pot LifeMaterial Temperature Time 20 °C (68 °F) ~35 minutes
Curing TimeAmbient & Substrate Temperature Foot Traffic Full cure 10 °C (50 °F) ~36 hours ~10 days 20 °C (68 °F) ~18 hours ~07 days 30 °C (86 °F) ~08 hours ~04 days Note: Curing times will vary according to ambient air and substrate temperatures and relative humidity. Freshly applied material should be protected from dampness, condensation, and water for at least 72 hours following the end of the application.
Consumption2.6 m 2 /L (106 ft 2 /US gal) at 15 mils w.f.t. per coat Note: Actual coverage rates and material consumption will depend upon porosity and profile of substrates. Test sections are recommended to establish correct coverage.
SUBSTRATE QUALITYConcrete surfaces must be clean and sound. The compressive strength of the concrete substrate should be at least 25 MPa (3625 psi) at 28 days and a minimum of 1.5 MPa (217 psi) in tensile strength, at the time of the application. Substrates must be free of contaminants such as dust, dirt, existing paint films, efflorescence, exudates, laitance, form, hydraulic or fuel oils, brake fluid, grease, fungi, mildew, biological residues or any other contaminants which may prohibit good bond or conditions of the substrate that may reduce the overall performances of Sikafloor®-1620.
MIXINGMix Ratio: Components A:B = 3:1 (by volume) IMPORTANT: Do not hand mix Sikafloor ® materials; mechanically mix only. Sikafloor®-1620 must be applied as supplied. Pre-stir Components A and B separately, making sure all solids, including trace dye, are evenly distributed and uniform consistencies are achieved within each individual Component. Empty Component B (Hardener) in the correct mix ratio into Component A (Resin) or empty Component A into a suitably sized and clean pail and add Component B in the correct ratio. Blend the combined components thoroughly at low speed (300 - 450 rpm) for at least three (3) minutes using a drill fitted with an Exomixer ® or Jiffy type paddle suited to the dimensions of the mixing container and keep the mixing paddle in the mix to minimize entrapped air. Take care not to introduce any air bubbles while mixing. Make sure the contents are completely mixed to avoid any weak or partially cured spots in the coating. During the mixing operation, scrape down the sides and bottom of the container with a flat or straight edge trowel at least once to ensure complete mixing. Do not attempt to attend to unmixed material that may gather on the sides of the mixing container while mechanical or electrical parts are in motion. When completely mixed, Sikafloor®-1620 should be uniform in appearance and consistency. Note: Prepare only the amount that can be applied within the open time (i.e., during the pot life) and at the actual job site temperature.
APPLICATIONConcrete with Measured Moisture Content < 6 % Apply one (1) coat of Sikafloor®-1620 with a squeegee at the rate of 2.6 m 2 /L (106 ft 2 /US gal) at 15 mils w.f.t. thickness and back roll with pressure after 20 minutes. Coverage will vary depending on the porosity and profile of the prepared substrate. Do not apply by dipping roller into mixing container or a paint tray; instead pour a bead of the mixed material, in the form of a ribbon, onto the surface to be coated and then spread with a squeegee and back roll. Ensure that the Sikafloor®-1620 prime coat is pore- and pinhole-free and provides uniform and complete coverage over the entire concrete substrate. Concrete with a Measured Moisture Content > 6 % Apply a minimum 3 mm thick layer of Sikafloor ® -81 EpoCem ® CA following the application instructions published on the product data sheet. Once cured, apply one (1) coat of Sikafloor®-1620 with a squeegee at the rate of 2.6 m 2 /L (106 ft 2 /US gal) at 15 mils wet film thickness and back roll with pressure after 20 minutes.   Do not apply by dipping roller into mixing container or a paint tray; instead pour a bead of the mixed material, in the form of a ribbon, onto the surface to be coated and then spread with a squeegee and back roll. Ensure that the Sikafloor®-1620 prime coat is pore- and pinhole-free and provides uniform and complete coverage over the entire Sikafloor ® -81 EpoCem ® CA substrate.
CLEAN UPClean all tools and equipment with a non-flammable solvent. Once hardened, product can only be removed mechanically.
Cure timeAmbient & Substrate Foot Traffic Full cure Temperature 10 °C (50 °F) ~36 hours ~10 days 20 °C (68 °F) ~18 hours ~07 days 30 °C (86 °F) ~08 hours ~04 days
Application temperatureMinimum: 10 °C (50 °F) / Maximum: 30 °C (86 °F)
THE DOCUMENT CENTRE

KNOW BEFORE
YOU COAT.

Technical information.
Safety information.
Ready when you need it.

Check the product label and current manufacturer documents for the exact component, colour and region before use.

Full product details, applications & manufacturer specifications

Sikafloor®-1620 is a state of the art, multi-component, high solids, low viscosity, moisture tolerant, epoxy primer that forms a dense, low permeability film on concrete substrates to significantly reduce moisture vapour transmission in compliance with ASTM F3010.

Sikafloor®-1620 contains a blue trace dye that acts as a visual aid to ensure complete coverage.

Sikafloor®-1620 is designed to treat high moisture concrete substrates where Sikafloor ® , Sikagard ® and Sikalastic ® resin systems are due to be installed where a measured moisture content up to 6 % (p.b.w. – part by weight), as determined with a Tramex® CME / CMEXpert concrete moisture meter.

Floors
Coverage

2.6 m 2 /L (106 ft 2 /US gal) at 15 mils w.f.t. per coat Note: Actual coverage rates and material consumption will depend upon porosity and profile of substrates. Test sections are recommended to establish correct coverage.

Application method
View manufacturer details

Concrete with Measured Moisture Content < 6 % Apply one (1) coat of Sikafloor®-1620 with a squeegee at the rate of 2.6 m 2 /L (106 ft 2 /US gal) at 15 mils w.f.t. thickness and back roll with pressure after 20 minutes. Coverage will vary depending on the porosity and profile of the prepared substrate. Do not apply by dipping roller into mixing container or a paint tray; instead pour a bead of the mixed material, in the form of a ribbon, onto the surface to be coated and then spread with a squeegee and back roll. Ensure that the Sikafloor®-1620 prime coat is pore- and pinhole-free and provides uniform and complete coverage over the entire concrete substrate. Concrete with a Measured Moisture Content > 6 % Apply a minimum 3 mm thick layer of Sikafloor ® -81 EpoCem ® CA following the application instructions published on the product data sheet. Once cured, apply one (1) coat of Sikafloor®-1620 with a squeegee at the rate of 2.6 m 2 /L (106 ft 2 /US gal) at 15 mils wet film thickness and back roll with pressure after 20 minutes.   Do not apply by dipping roller into mixing container or a paint tray; instead pour a bead of the mixed material, in the form of a ribbon, onto the surface to be coated and then spread with a squeegee and back roll. Ensure that the Sikafloor®-1620 prime coat is pore- and pinhole-free and provides uniform and complete coverage over the entire Sikafloor ® -81 EpoCem ® CA substrate.

Drying time

Curing Time: Ambient & Substrate Temperature Foot Traffic Full cure 10 °C (50 °F) ~36 hours ~10 days 20 °C (68 °F) ~18 hours ~07 days 30 °C (86 °F) ~08 hours ~04 days Note: Curing times will vary according to ambient air and substrate temperatures and relative humidity. Freshly applied material should be protected from dampness, condensation, and water for at least 72 hours following the end of the application.

Recoat time

Before applying Sikafloor® Epoxy or Sikafloor® Polyurethane on Sikafloor®- 1620 allow: Ambient & Substrate Minimum Maximum Temperature 10 °C (50 °F) ~24 hours 72 hours 20 °C (68 °F) ~8 hours 48 hours 30 °C (86 °F) ~5 hours 24 hours

Use the sheet for your exact product code and finish. Coverage and times depend on the stated temperature, humidity, substrate and coat thickness.

Features

  • Economical single coat application
  • Low permeability ~0.06 perms (15 mils d.f.t) ASTM E96
  • Exceeds the requirements of ASTM F3010 Standard Practice For Two-Component Resin Based Membrane-Forming Moisture Mitigation Systems For Use Under Resilient Floor Coverings
  • Cured resin resists high moisture vapour emission rates (MVER) up to 25 lbs as per ASTM F1869, 100 % R.H. as per ASTM F2170 and resist high alkalinity to pH 14
  • Low viscosity provides superior penetration and stabilization of cementitious substrates.
  • Resistant to substrate out-gas bubbling
  • High bond strength
  • Low odour and low VOC
Packaging
Components A+B: 15.12 L (4 US gal) Component A: 11.34 L (3 US gal) Component B: 3.78 L  (1 US gal)
APPROVALS / CERTIFICATES
Meets the requirements of CFIA for use in food plants
Shelf Life
2 years in original unopened container under proper storage conditions
Storage Conditions
Store in a dry place, protected from freezing at a temperature between 5 °C and 32 °C (41 °F and 90 °F).  Protect from freezing. If Sikafloor®-1620 has frozen, contact Sika Canada.
Viscosity
~370 cps (ASTM D2196)
Solid content by volume
~99%
Shore D Hardness
~83 (ASTM D2240)
Compressive Strength
~99 MPa (~14,385 psi) (ASTM D695)
Tensile Strength in Flexure
~83.8 MPa (~12,154 psi) (ASTM D790)
Tensile Strength
~34 MPa (~4,931 psi) (ASTM D638)
Pull-Off Strength
~3 MPa (~435 psi) (100% concrete failure) (ASTM D7234)
Permeability to Water Vapour
~0.06 perm (at 15 mil d.f.t) (ASTM E 96)
Water Absorption
~0.0029% (24 hrs) ~0.007%  (7 days) (ASTM D570)
Mixing Ratio
A:B = 3:1 (by volume)
Product Temperature
Condition product at temperatures between 18 °C and 30 °C (65 °F and 86 °F) before and during application.
Ambient Air Temperature
Minimum: 10 °C (50 °F) / Maximum: 30 °C (86 °F) Note: Mixing carried out under conditions where the Sikafloor®-1620 temperature and ambient temperature are below 18 °C (65 °F) will result in reduced product workability and slower curing rates.
Relative Air Humidity
Maximum 85 % (during application and curing)
Dew Point
Substrate must be at least 3 ˚C (5 ˚F) above the Dew Point to reduce the risk of condensation, which may lead to adhesion failure or “blushing” on the floor finish.  Be aware that the substrate temperature may be lower than the ambient temperature.
Substrate Temperature
Minimum: 10 °C (50 °F) / Maximum: 30 °C (86 °F) Note: Any attempt to apply Sikafloor®-1620 at substrate temperature conditions less than 18 °C (65 °F) will result in an increase in viscosity and slower cure rates
Substrate Moisture Content
Moisture content of concrete substrate must not exceed 6 % by mass (p.b.w. – part by weight) as measured with a Tramex® CM/E concrete moisture meter on a mechanically-prepared surface (mechanical preparation to ICRI / CSP 3-4).
Pot Life
Material Temperature Time 20 °C (68 °F) ~35 minutes
Curing Time
Ambient & Substrate Temperature Foot Traffic Full cure 10 °C (50 °F) ~36 hours ~10 days 20 °C (68 °F) ~18 hours ~07 days 30 °C (86 °F) ~08 hours ~04 days Note: Curing times will vary according to ambient air and substrate temperatures and relative humidity. Freshly applied material should be protected from dampness, condensation, and water for at least 72 hours following the end of the application.
Consumption
2.6 m 2 /L (106 ft 2 /US gal) at 15 mils w.f.t. per coat Note: Actual coverage rates and material consumption will depend upon porosity and profile of substrates. Test sections are recommended to establish correct coverage.
SUBSTRATE QUALITY
Concrete surfaces must be clean and sound. The compressive strength of the concrete substrate should be at least 25 MPa (3625 psi) at 28 days and a minimum of 1.5 MPa (217 psi) in tensile strength, at the time of the application. Substrates must be free of contaminants such as dust, dirt, existing paint films, efflorescence, exudates, laitance, form, hydraulic or fuel oils, brake fluid, grease, fungi, mildew, biological residues or any other contaminants which may prohibit good bond or conditions of the substrate that may reduce the overall performances of Sikafloor®-1620.
MIXING
Mix Ratio: Components A:B = 3:1 (by volume) IMPORTANT: Do not hand mix Sikafloor ® materials; mechanically mix only. Sikafloor®-1620 must be applied as supplied. Pre-stir Components A and B separately, making sure all solids, including trace dye, are evenly distributed and uniform consistencies are achieved within each individual Component. Empty Component B (Hardener) in the correct mix ratio into Component A (Resin) or empty Component A into a suitably sized and clean pail and add Component B in the correct ratio. Blend the combined components thoroughly at low speed (300 - 450 rpm) for at least three (3) minutes using a drill fitted with an Exomixer ® or Jiffy type paddle suited to the dimensions of the mixing container and keep the mixing paddle in the mix to minimize entrapped air. Take care not to introduce any air bubbles while mixing. Make sure the contents are completely mixed to avoid any weak or partially cured spots in the coating. During the mixing operation, scrape down the sides and bottom of the container with a flat or straight edge trowel at least once to ensure complete mixing. Do not attempt to attend to unmixed material that may gather on the sides of the mixing container while mechanical or electrical parts are in motion. When completely mixed, Sikafloor®-1620 should be uniform in appearance and consistency. Note: Prepare only the amount that can be applied within the open time (i.e., during the pot life) and at the actual job site temperature.
APPLICATION
Concrete with Measured Moisture Content < 6 % Apply one (1) coat of Sikafloor®-1620 with a squeegee at the rate of 2.6 m 2 /L (106 ft 2 /US gal) at 15 mils w.f.t. thickness and back roll with pressure after 20 minutes. Coverage will vary depending on the porosity and profile of the prepared substrate. Do not apply by dipping roller into mixing container or a paint tray; instead pour a bead of the mixed material, in the form of a ribbon, onto the surface to be coated and then spread with a squeegee and back roll. Ensure that the Sikafloor®-1620 prime coat is pore- and pinhole-free and provides uniform and complete coverage over the entire concrete substrate. Concrete with a Measured Moisture Content > 6 % Apply a minimum 3 mm thick layer of Sikafloor ® -81 EpoCem ® CA following the application instructions published on the product data sheet. Once cured, apply one (1) coat of Sikafloor®-1620 with a squeegee at the rate of 2.6 m 2 /L (106 ft 2 /US gal) at 15 mils wet film thickness and back roll with pressure after 20 minutes.   Do not apply by dipping roller into mixing container or a paint tray; instead pour a bead of the mixed material, in the form of a ribbon, onto the surface to be coated and then spread with a squeegee and back roll. Ensure that the Sikafloor®-1620 prime coat is pore- and pinhole-free and provides uniform and complete coverage over the entire Sikafloor ® -81 EpoCem ® CA substrate.
CLEAN UP
Clean all tools and equipment with a non-flammable solvent. Once hardened, product can only be removed mechanically.
Cure time
Ambient & Substrate Foot Traffic Full cure Temperature 10 °C (50 °F) ~36 hours ~10 days 20 °C (68 °F) ~18 hours ~07 days 30 °C (86 °F) ~08 hours ~04 days
Application temperature
Minimum: 10 °C (50 °F) / Maximum: 30 °C (86 °F)
COLOUR / FINISH / POSSIBILITIES

Colours &
finish options.

Explore the published colour and finish information for this product.

Translucent blue (after mixing)

PRODUCT COLOUR COLLECTION

Sikafloor®-1620 colour options

1 of 1 references

The blue trace dye helps show coverage. This primer does not have a decorative colour range.

  • Translucent blue
View the full product colour collection

Complete your project.

Companion products for the selected product and system.

  • Coating Squeegee

    Spread the floor coating using the specified squeegee method.

    Select a squeegee blade suitable for the coating’s specified wet film and back-roll as directed by the Sika sheet. Control the material spread rate; a large-notched blade is not automatically suitable for a thin-film coating. Pour the mixed material as a ribbon onto the substrate; do not dip a roller in a container or tray. Follow the moisture-specific substrate system.

Explore related categories

SUPERIOR COATINGS / THUNDER BAY

BIG PROJECT?
LET’S TALK.

Share the surface, its condition and what it needs to stand up to. We’ll help you work through the product choices and preparation.

Ask about Sikafloor®-1620
VISIT SUPERIOR COATINGS

Find us in Thunder Bay.

550 Fort William Road
Thunder Bay, Ontario

Call 807-345-4511 ↗

550 Fort William Road, Thunder Bay

Compare your products

Ask our team ↗

Swipe across to compare products. Detail labels stay visible.

Check official product documents and confirm suitability with our team.

YOUR IDEAS, TOGETHER

My Projects

YOUR PROJECTS, WHEREVER YOU ARE

Keep your plans close.

Create a free account to pick up your projects on another device. Your saved colours, products and notes come with you.

How saved projects and account information work (opens in a new tab)