Skip to content
← Sika / Industrial & Construction
Sika · Industrial & Construction

Sikagard® Duroplast EE

Sikagard® Duroplast EE is a two-part, high performance water-based epoxy blockfiller designed to prime and fill small pours and reduce surface irregularities on properly prepared walls and ceilings.

Sikagard® Duroplast EE product image
Sikagard® Duroplast EE
THE MANUFACTURERSika

Good products.
Local knowledge.

ChemistryWater-based epoxy
ComponentsTwo-part
Mixing ratio1 : 1 by volume
THE RIGHT START MATTERS

KNOW THE
PROJECT.
PLAN THE
DETAILS.

Sikagard® Duroplast EE is a two-part, high performance water-based epoxy blockfiller designed to prime and fill small pours and reduce surface irregularities on properly prepared walls and ceilings.

Start with the surface, the existing finish and the way the space or equipment is used. Our team can help you work through product choices and the requirements for your project.

Get into the details
Sikagard® Duroplast EE product image
A closer look at Sikagard® Duroplast EEProduct image. Confirm the model, finish and current packaging with our team.
01 / CHECK

The project.

Identify the material, its condition and the work you’re planning.

02 / PLAN

The system.

Confirm product suitability, preparation and compatibility with our team.

03 / CONFIRM

The conditions.

Check the current manufacturer instructions for application, installation or maintenance requirements.

PRODUCT SPECIFICATIONS

THE DETAILS.
ALL HERE.

Keep the technical information close.
Use the current manufacturer documents when planning the work.

Open the document centre
Sikagard® Duroplast EE product specifications
Packaging37.85 L (10 US gal.) units
ENVIRONMENTAL INFORMATIONPotential of contribution towards LEED®v4 credits. Contact Sika Canada.
APPROVALS / CERTIFICATESMeets the requirements of CFIA and USDA for use in food plants.
Shelf Life1 year in original unopened container.
Storage ConditionsStore dry at temperatures between 5 °C to 32 °C (41 °F to 89 °F). Protect from freezing. If frozen, discard.  Precondition material for at least 24 hours between 18 °C to 30 °C (65 °F to 86 °F) before use.
Solid content by weight~68 %
Solid content by volume~50 %
Volatile organic compound (VOC) content~65 g/L
Mixing RatioA:B =1:1 by volume
Ambient Air TemperatureMinimum 10 °C (50 °F ) Maximum 30 °C (86 °F). Ambient Air Relative Humidity: Maximum 85 % (during application & cure). NOTE: Application attempted at low ambient air or substrate temperatures and/or under high humidity conditions, will result in a decrease in product workability and slower cure rates.
Dew PointBeware of condensation! The substrate must be at least 3 °C (5 °F) above the Dew Point to reduce the risk of condensation, which may lead to adhesion failure or “blushing” on the finish. Be aware that the substrate temperature may be lower than the ambient air temperature.
Substrate TemperatureMinimum 10 °C (50 °F ) Maximum 30 °C (86 °F).
Substrate Moisture ContentMaximum moisture content of all concrete substrates must be < 4 % by mass (pbw - part by weight) when measured with a calibrated moisture meter for concrete (Tramex CME/CMExpert). Masonry surfaces, gypsum board and plaster must be below 85 (green zone on the reference scale) when measured with a calibrated electronic moisture meter (Delmhorst Model BD-10). Minimum age of concrete and masonry surfaces prior to application: 28 days (depending on curing and drying conditions). Minimum age of SikaTop® or Sika MonoTop® mortar prior to application: three (3) days, depending on curing and drying conditions. Moisture content must be < 4 % by mass (pbw - parts by weight) when measured with a calibrated moisture meter for concrete (Tramex CME/CMExpert).
Pot Life23 °C (73 °F) ~3 hours
Curing TimeTouch dry at 23 °C (73 °F) ~2 hours to ~3 hours Recoat time at 23 °C (73 °F) ~7 hours to ~9 hours Overcoat time at 23 °C (73 °F) ~24 hours to ~48 hours Full cure at 23 °C (73 °F) ~7 days Drying times will vary according to air and substrate temperature and relative humidity. Protect from dampness, condensation and water contact during the initial 24 hour cure period.
Consumption1.2 m 2 /L to 2.0 m 2 /L (50 ft 2 /US gal to 80 ft 2 /US gal.) per coat (33 mil w.f.t. to 20 mil w.f.t. / 16 mil d.f.t. to 10 mil d.f.t.) Typically one (1) coat is required, though on higher absorbency substrates a second coat may be required. Actual coverage rates and material consumption will depend upon porosity and profile of substrates. Test areas are recommended to establish correct coverage rates.
MIXINGMixing Ratio A:B =1:1 by volume Do not hand mix Sikagard® Duroplast® resin materials: mechanical mix only. Pre-stir each component separately to ensure that all soft settling is dispersed, solids are evenly distributed throughout and components are consistent within themselves. Empty Component B in the correct mix ratio to Component A into a suitably sized, clean mixing vessel. Mix the combined components for at least three (3) minutes, using a low-speed drill (200-300 rpm) to minimize entrapping air. Use an Exomixer® or Jiffy type mixing paddle (recommended model) suited to the volume of the mixing container. During the mixing operation, scrape down the sides and bottom of the container with a flat or straight edge trowel at least once, to ensure complete mixing. When completely mixed, Sikagard® Duroplast EE should be uniform in colour and consistency. Allow the mixed material to stand (induction time) for one (1) hour, then lightly remix to ensure uniformity before applying. Failure to do so will result in unsatisfactory performance. Do not mix more material than can be applied within the working time limits (i.e. Pot Life) at the actual field temperature.
APPLICATIONSikagard® Duroplast EE can be applied by brush, roller or spray equipment, dependent on limitatiions and site conditions. If sprayed, the material must be back rolled/brushed to ensure good penetration of the blockfiller into the substrate. Sikagard® Duroplast EE must be applied in a workmanlike manner using skilled and trade qualified applicators. The film thicknesses stated must be produced and complete coverage achieved (This condition may require a second coat). After application and prior to drying, remove masking tape in between each coat to avoid ‘ripping’ in the finished coating and let surfaces dry completely. Following cure of blockfiller coats, sand off any rough spots and visible defects with a fine sandpaper (120–220 grit), then vacuum and wipe surface to remove all residual traces of sanding dust before the application of the body coats.
CLEAN UPClean tools and brushes with warm water and where required, detergent.  Once hardened, product can only be removed mechanically.
Cure timeTouch dry at 23 °C (73 °F) ~2 hours to ~3 hours Recoat time at 23 °C (73 °F) ~7 hours to ~9 hours Overcoat time at 23 °C (73 °F) ~24 hours to ~48 hours Full cure at 23 °C (73 °F) ~7 days Drying times will vary according to air and substrate temperature and relative humidity.
Application temperatureMinimum 10 °C (50 °F ) Maximum 30 °C (86 °F).
VOC~65 g/L
THE DOCUMENT CENTRE

KNOW BEFORE
YOU START.

Technical information.
Safety information.
Ready when you need it.

Check the product label and current manufacturer documents for the exact component, colour and region before use.

Full product details, applications & manufacturer specifications

Sikagard® Duroplast EE is a two-part, high performance water-based epoxy blockfiller designed to prime and fill small pours and reduce surface irregularities on properly prepared walls and ceilings.

It serves to fill voids on porous surfaces and improve both the adhesion and appearance of high quality Sikagard® Duroplast® finishes that will be exposed to high levels of moisture in-service.

Interior applications on wall and ceiling constructed from concrete block, masonry units, poured or precast concrete to obtain a filled surface profile. To provide superior bonding properties needed to support two-part epoxy and urethane finish coats in high abuse installation. To fill and seal walls and ceilings with variable absorption which might excessively absorb coatings. Wet and dry process areas subject to repeated cleaning such as; food and beverage processing plants, health care facilities, pharmaceutical, laboratories, animal care facilities, wash bays, locker and shower rooms. Used in new construction and maintenance work.

Floors
Coverage

1.2 m 2 /L to 2.0 m 2 /L (50 ft 2 /US gal to 80 ft 2 /US gal.) per coat (33 mil w.f.t. to 20 mil w.f.t. / 16 mil d.f.t. to 10 mil d.f.t.) Typically one (1) coat is required, though on higher absorbency substrates a second coat may be required. Actual coverage rates and material consumption will depend upon porosity and profile of substrates. Test areas are recommended to establish correct coverage rates.

Application method
View manufacturer details

Sikagard® Duroplast EE can be applied by brush, roller or spray equipment, dependent on limitatiions and site conditions. If sprayed, the material must be back rolled/brushed to ensure good penetration of the blockfiller into the substrate. Sikagard® Duroplast EE must be applied in a workmanlike manner using skilled and trade qualified applicators. The film thicknesses stated must be produced and complete coverage achieved (This condition may require a second coat). After application and prior to drying, remove masking tape in between each coat to avoid ‘ripping’ in the finished coating and let surfaces dry completely. Following cure of blockfiller coats, sand off any rough spots and visible defects with a fine sandpaper (120–220 grit), then vacuum and wipe surface to remove all residual traces of sanding dust before the application of the body coats.

Drying time

Curing Time: Touch dry at 23 °C (73 °F) ~2 hours to ~3 hours Recoat time at 23 °C (73 °F) ~7 hours to ~9 hours Overcoat time at 23 °C (73 °F) ~24 hours to ~48 hours Full cure at 23 °C (73 °F) ~7 days Drying times will vary according to air and substrate temperature and relative humidity. Protect from dampness, condensation and water contact during the initial 24 hour cure period.

Use the sheet for your exact product code and finish. Coverage and times depend on the stated temperature, humidity, substrate and coat thickness.

Features

  • Material is convenient to proportion, 1:1 by volume resin to hardener ratio
  • Low odour and low VOC
  • Excellent bond and adhesion promotion
  • Superior moisture resistance
  • Good chemical resistance
  • Good bridging and filling properties
  • Good hiding capacity
  • Provides a more uniform even surface to coat
  • Fully compatible with Sikagard® Duroplast® finishes
  • Clean-up with water
Packaging
37.85 L (10 US gal.) units
ENVIRONMENTAL INFORMATION
Potential of contribution towards LEED®v4 credits. Contact Sika Canada.
APPROVALS / CERTIFICATES
Meets the requirements of CFIA and USDA for use in food plants.
Shelf Life
1 year in original unopened container.
Storage Conditions
Store dry at temperatures between 5 °C to 32 °C (41 °F to 89 °F). Protect from freezing. If frozen, discard.  Precondition material for at least 24 hours between 18 °C to 30 °C (65 °F to 86 °F) before use.
Solid content by weight
~68 %
Solid content by volume
~50 %
Volatile organic compound (VOC) content
~65 g/L
Mixing Ratio
A:B =1:1 by volume
Ambient Air Temperature
Minimum 10 °C (50 °F ) Maximum 30 °C (86 °F). Ambient Air Relative Humidity: Maximum 85 % (during application & cure). NOTE: Application attempted at low ambient air or substrate temperatures and/or under high humidity conditions, will result in a decrease in product workability and slower cure rates.
Dew Point
Beware of condensation! The substrate must be at least 3 °C (5 °F) above the Dew Point to reduce the risk of condensation, which may lead to adhesion failure or “blushing” on the finish. Be aware that the substrate temperature may be lower than the ambient air temperature.
Substrate Temperature
Minimum 10 °C (50 °F ) Maximum 30 °C (86 °F).
Substrate Moisture Content
Maximum moisture content of all concrete substrates must be < 4 % by mass (pbw - part by weight) when measured with a calibrated moisture meter for concrete (Tramex CME/CMExpert). Masonry surfaces, gypsum board and plaster must be below 85 (green zone on the reference scale) when measured with a calibrated electronic moisture meter (Delmhorst Model BD-10). Minimum age of concrete and masonry surfaces prior to application: 28 days (depending on curing and drying conditions). Minimum age of SikaTop® or Sika MonoTop® mortar prior to application: three (3) days, depending on curing and drying conditions. Moisture content must be < 4 % by mass (pbw - parts by weight) when measured with a calibrated moisture meter for concrete (Tramex CME/CMExpert).
Pot Life
23 °C (73 °F) ~3 hours
Curing Time
Touch dry at 23 °C (73 °F) ~2 hours to ~3 hours Recoat time at 23 °C (73 °F) ~7 hours to ~9 hours Overcoat time at 23 °C (73 °F) ~24 hours to ~48 hours Full cure at 23 °C (73 °F) ~7 days Drying times will vary according to air and substrate temperature and relative humidity. Protect from dampness, condensation and water contact during the initial 24 hour cure period.
Consumption
1.2 m 2 /L to 2.0 m 2 /L (50 ft 2 /US gal to 80 ft 2 /US gal.) per coat (33 mil w.f.t. to 20 mil w.f.t. / 16 mil d.f.t. to 10 mil d.f.t.) Typically one (1) coat is required, though on higher absorbency substrates a second coat may be required. Actual coverage rates and material consumption will depend upon porosity and profile of substrates. Test areas are recommended to establish correct coverage rates.
MIXING
Mixing Ratio A:B =1:1 by volume Do not hand mix Sikagard® Duroplast® resin materials: mechanical mix only. Pre-stir each component separately to ensure that all soft settling is dispersed, solids are evenly distributed throughout and components are consistent within themselves. Empty Component B in the correct mix ratio to Component A into a suitably sized, clean mixing vessel. Mix the combined components for at least three (3) minutes, using a low-speed drill (200-300 rpm) to minimize entrapping air. Use an Exomixer® or Jiffy type mixing paddle (recommended model) suited to the volume of the mixing container. During the mixing operation, scrape down the sides and bottom of the container with a flat or straight edge trowel at least once, to ensure complete mixing. When completely mixed, Sikagard® Duroplast EE should be uniform in colour and consistency. Allow the mixed material to stand (induction time) for one (1) hour, then lightly remix to ensure uniformity before applying. Failure to do so will result in unsatisfactory performance. Do not mix more material than can be applied within the working time limits (i.e. Pot Life) at the actual field temperature.
APPLICATION
Sikagard® Duroplast EE can be applied by brush, roller or spray equipment, dependent on limitatiions and site conditions. If sprayed, the material must be back rolled/brushed to ensure good penetration of the blockfiller into the substrate. Sikagard® Duroplast EE must be applied in a workmanlike manner using skilled and trade qualified applicators. The film thicknesses stated must be produced and complete coverage achieved (This condition may require a second coat). After application and prior to drying, remove masking tape in between each coat to avoid ‘ripping’ in the finished coating and let surfaces dry completely. Following cure of blockfiller coats, sand off any rough spots and visible defects with a fine sandpaper (120–220 grit), then vacuum and wipe surface to remove all residual traces of sanding dust before the application of the body coats.
CLEAN UP
Clean tools and brushes with warm water and where required, detergent.  Once hardened, product can only be removed mechanically.
Cure time
Touch dry at 23 °C (73 °F) ~2 hours to ~3 hours Recoat time at 23 °C (73 °F) ~7 hours to ~9 hours Overcoat time at 23 °C (73 °F) ~24 hours to ~48 hours Full cure at 23 °C (73 °F) ~7 days Drying times will vary according to air and substrate temperature and relative humidity.
Application temperature
Minimum 10 °C (50 °F ) Maximum 30 °C (86 °F).
VOC
~65 g/L
COLOUR / FINISH / POSSIBILITIES

Colours &
finish options.

Explore the published colour and finish information for this product.

Off-white

PRODUCT COLOUR COLLECTION

Sikagard® Duroplast EE colour options

1 of 1 references

This blockfiller has a fixed colour, not a topcoat palette.

  • Off-white
View the full product colour collection

Complete your project.

Companion products for the selected product and system.

  • Sika® Duroplast 150

    A compatible finish for the Duroplast wall system.

    Choose the complete system for the substrate and service conditions.

Explore related categories

SUPERIOR COATINGS / THUNDER BAY

BIG PROJECT?
LET’S TALK.

Share the surface, its condition and what it needs to stand up to. We’ll help you work through the product choices and preparation.

Ask about Sikagard® Duroplast EE
VISIT SUPERIOR COATINGS

Find us in Thunder Bay.

550 Fort William Road
Thunder Bay, Ontario

Call 807-345-4511 ↗

550 Fort William Road, Thunder Bay

Compare your products

Ask our team ↗

Swipe across to compare products. Detail labels stay visible.

Check official product documents and confirm suitability with our team.

YOUR IDEAS, TOGETHER

My Projects

YOUR PROJECTS, WHEREVER YOU ARE

Keep your plans close.

Create a free account to pick up your projects on another device. Your saved colours, products and notes come with you.

How saved projects and account information work (opens in a new tab)